The scope of work as normally carryout is as follows.

  1. Collection of information by discussions, drawings and site visits.
  2. Study of electrical requirements.
  3. Study of other services like telephone, data network, TV cables, and music, security system, fire protection, if required.
  4. Preparation of Load calculation sheet.
  5. Preparation of design for electrical system.
  6. Preparation of single line diagrams.
  7. Preparation of electrical layouts for electrical equipments.
  8. Preparation of quantity estimate for the electrical material.
  9. Preparation of cost estimate based on market values.
  10. Preparation of specification sheets for selection of material and working methods.
  11. Preparation of Bill of Quantities for the electrification.
  12. Control of work progress through routine meetings.
  13. Control of work quality.